Case Studies

Case Studies Banner

 


A containerised three-phase power and water-treatment system with integrated solar generation, engineered for reliable remote operation

Read how the MI Engineering team assisted in overcoming the challenge of designing and building a reliable off-grid container-based system to provide 3 phase power in a remote location

Read the case study

Custom lithium battery engineering for autonomous aerial systems

For this mission-critical autonomous aerial application, our engineering team had to develop a battery to deliver consistent high current and maximise usable run time within tight space and weight limits. Connections and internal components needed to withstand vibration and high G forces, while limiting heat build-up. All while supporting repeatable manufacture.

Read the case study

Back to the top of page MI Link Contact Us